Structural fabrication shop
Structural steel
| Metric | Typical | Target |
|---|---|---|
| Scrap rate | 6–10% | 4–7% |
| Rework hours / week | 20–40 hrs | Up to 50% reduction |
| Traceability | Manual logs | Automated per-piece |
Solutions / Production
Everything in Pilot plus advanced analytics, QA scoring, custom calibration profiles, and priority support. The tier most teams scale into after proving ROI.
ERP / Detailing
Cut lists, schedules, bar marks
Reality Anchors
Validate, guide, record
Bench / Operator
Step-by-step execution
ERP / QA
Audit trail, metrics, exports
Material waste
Miscuts, wrong bar marks, and untracked offcuts add up to 6–10% scrap on a typical commercial shop.
6–10% typical scrap
Rework and delays
Manual errors caught late in the process mean re-fabrication, missed deadlines, and overtime.
20+ hrs/month rework
No execution data
Without per-step records, you can't trace problems, prove quality, or optimize future jobs.
Zero audit trail
We do not price against self-reported scrap rates. Instead, we use industry-typical ranges by segment and apply conservative deltas. This prevents pricing inflation and keeps contracts stable over time.
| Segment | Typical scrap | After Reality Anchors | Annual savings potential |
|---|---|---|---|
| Small commercial shop | 6–10% | 4–7% | $8k–$25k |
| Prefab yard | 4–7% | 2.5–5% | $25k–$80k |
| Multi-bench operation | 3–6% | 2–4% | $50k–$150k+ |
Contracts reference a baseline model version for clarity.
Illustrative Scenarios
Representative scenarios illustrating how the platform is designed to perform across different fabrication environments. Based on modeled assumptions, not specific customer data.
Structural steel
| Metric | Typical | Target |
|---|---|---|
| Scrap rate | 6–10% | 4–7% |
| Rework hours / week | 20–40 hrs | Up to 50% reduction |
| Traceability | Manual logs | Automated per-piece |
Precast concrete
| Metric | Typical | Target |
|---|---|---|
| Calibration drift events / mo | 8–15 | Up to 80% reduction |
| QA documentation time | 4–6 hrs / day | 1–2 hrs / day |
| Scrap rate | 5–9% | 3–6% |
Rebar fabrication
| Metric | Typical | Target |
|---|---|---|
| Miscut rate | 4–7% | 1–3% |
| Plan-to-cut latency | 10–20 min | < 5 s |
| Shift-to-shift variance | High | Minimal |
Validate fit and measure impact before a broader rollout. Walk away after 60 days if the numbers don't work — no lock-in.
Week 1–2
Onboarding
Baseline metrics captured, workflows configured, operators trained.
Week 3–8
Validation
60-day window measuring scrap, rework, and throughput against baselines.
Week 9+
Decision
Review results against baselines. Scale, adjust, or walk away — no lock-in.
Paired with baseline measurement and a 60-day validation window.
Core
Scrap Δ target: Up to 1.8 pts
Learn more →Pro
Reuse uplift target: Up to 23%
Learn more →Pro
Drift band target: ±0.2°
Learn more →Get in Touch
Complete the form and we'll return with a fit assessment, suggested rollout scope, and an estimate of what you could save.